Preparing the project for the interior and exterior living areas of private or commercial yachts by taking all the aspects into consideration that are related to the owner, the yacht’s engineering design, and all possible other aspects, and supervising the construction process.
All these duties are carried out in close co-operation with the engineer, the shipyard and the other parties who are in charge of the design and the construction process, which would enable to foresee and prevent any possible forthcoming problems.
The below listed stages of a yacht project can be totally or partially carried out either for a new built or a refit project.
Conceptual Design
* Identify the general concept
* Prepare the color, texture and the material scheme
* Prepare the mood boards and material boards
* Identify the main concept with 3D renderings and hand sketches
* Finalize the general arrangement plan
Either 10 m tender or 150 m charter ship, the nourishing point of any project is preparing the main concept precisely.
Definition of the main concept is realized by taking the expectations and preferences of the owner about the functional and aesthetic aspects of the interior and the exterior areas as well as all the structural limitations of the yacht.
As long as the main concept is settled, all the details of the boat will speak the same language, from the material finish of the lighting fixture above the boom; to the napkin used on the dining table.
The main concept that is once settled, enables the numerous details from the color of the crew outfit to the design of the custom designed carpet used to be in harmony with each other.
During this process, the main furniture details as long as the types of wood veneers and fabrics are discussed thoroughly. The decisions are made with the help of three dimensional drawings, sketches, renderings, mood boards and one to one material samples.
While working on the main concept, the general layout plan is also finalized related to all the needs and expectations of the boat owner by seeking all the possible arrangements.
Construction Project
* Clarify all the details related to the construction
* Prepare the executive drawings as built, for the shipyard and the other manufacturers
* Gather all the techincal aspects together on the drawing sheets
* Prepare the realistic rendered 3D drawings for all areas
Once the general arrangement plan and the concept sheets are approved, the detailed and precise shop drawings for all the areas of the boat are prepared.
These drawings include all the construction details and material information to enable the producers to work easy and fast.
The data included are numerous, such as the exact positioning of switches, the places of the a/c units, exact openings required for the a/c grills, the hatches, manholes, the connections of the insulation materials and the furniture and likewise.
In order to obtain these construction drawings as detailed and realistic as they should be; all the information and the engineering drawings are obtained from the engineer of the boat.
Additionaly, all the information about the interior construction materials and the details are shown precisely in these drawings. The outcome of this process enables all furniture, the ceiling, wall panellings to be constructed by the shipyard.
The construction project is big pile of drawings that include the floor, ceiling plans, sectional frame draftings, furniture detail drawings and updated renderings of all the areas.
* Clarify all the details related to the construction
* Prepare the executive drawings as built, for the shipyard and the other manufacturers
* Gather all the techincal aspects together on the drawing sheets
* Prepare the realistic rendered 3D drawings for all areas
Once the general arrangement plan and the concept sheets are approved, the detailed and precise shop drawings for all the areas of the boat are prepared.
These drawings include all the construction details and material information to enable the producers to work easy and fast.
The data included are numerous, such as the exact positioning of switches, the places of the a/c units, exact openings required for the a/c grills, the hatches, manholes, the connections of the insulation materials and the furniture and likewise.
In order to obtain these construction drawings as detailed and realistic as they should be; all the information and the engineering drawings are obtained from the engineer of the boat.
Additionaly, all the information about the interior construction materials and the details are shown precisely in these drawings. The outcome of this process enables all furniture, the ceiling, wall panellings to be constructed by the shipyard.
The construction project is big pile of drawings that include the floor, ceiling plans, sectional frame draftings, furniture detail drawings and updated renderings of all the areas.
Decoration Project
* Finalize the material selection
* Design the custom products
* Prepare the material and equipment booklets
All the materials to be used are selected or designed if to be custom produced. These materials and equipment include surface and furniture materials as the fabrics, wood veneers, metals, wall papers.
As well as them; the fixtures as lighting, carpets, furniture accessories, cutlery, loose furniture, and also artworks, are either selected from the market or designed to be custom produced.
This stage of the project shall be carried on at the same time with the construction project since all the drawings and details are to include the information of the decorative materials.
The material boards and booklets that include samples and all the detailed information about the products are also completed during these studies.
* Finalize the material selection
* Design the custom products
* Prepare the material and equipment booklets
All the materials to be used are selected or designed if to be custom produced. These materials and equipment include surface and furniture materials as the fabrics, wood veneers, metals, wall papers.
As well as them; the fixtures as lighting, carpets, furniture accessories, cutlery, loose furniture, and also artworks, are either selected from the market or designed to be custom produced.
This stage of the project shall be carried on at the same time with the construction project since all the drawings and details are to include the information of the decorative materials.
The material boards and booklets that include samples and all the detailed information about the products are also completed during these studies.
Corporate Identity
* Finding the name when required
* Designing the logo for the boat
* Designing the identity all over the yacht
Taking the project as a whole package; the name, logo, the graphics and colors used are essential parts of the project. Bearing this concept in mind, the same identity is designed in coherence with all the equipment used onboard.
* Finding the name when required
* Designing the logo for the boat
* Designing the identity all over the yacht
Taking the project as a whole package; the name, logo, the graphics and colors used are essential parts of the project. Bearing this concept in mind, the same identity is designed in coherence with all the equipment used onboard.
Project Management
* Controlling the construction process
* Following the stages of purchasing
* Preparing the revisional sketches
In order to speed up the construction process and to enable the construction parties to be up to the required level of quality; controlling all the construction process is carried out from the beginning of the construction to the delivery of the vessel.
As well as that; any possible problems are solved or changes in ideas are put in practice during this stage of the project.
During every shipyard visit, reports are held, indicating the positive and negative points of the process and these reports are distributed to the relevant parties for good.
Any required revisions, any misunderstood details of the project are perceived and transmitted to the project firm, and solved on site if required.
* Controlling the construction process
* Following the stages of purchasing
* Preparing the revisional sketches
In order to speed up the construction process and to enable the construction parties to be up to the required level of quality; controlling all the construction process is carried out from the beginning of the construction to the delivery of the vessel.
As well as that; any possible problems are solved or changes in ideas are put in practice during this stage of the project.
During every shipyard visit, reports are held, indicating the positive and negative points of the process and these reports are distributed to the relevant parties for good.
Any required revisions, any misunderstood details of the project are perceived and transmitted to the project firm, and solved on site if required.